12-7-02
 | |
Preassembled walls were installed.
|
|
12-7-02
 | |
A view of the south wall.
|
|
12-8-02
 | |
An overnight dusting of snow.
|
|
12-8-02
 | |
The siding and door installed.
|
|
12-8-02
 | |
T1-11 siding was hung horizontal to match the cabin.
|
|
12-8-02
 | |
The original door from the cabin was trimmed to fit the four foot wall.
|
|
|
1-4-03
 | |
Applied first coat of stain seal.
|
|
|