2-8-03
 | |
Countersinking the screw holes in the steel rails.
|
|
2-22-03
 | |
Drilling the pilot hole for the lag bolt to fasten the end board.
|
|
2-22-03
 | |
The completed rail structure.
|
|
2-22-03
 | |
Looking south at the rail structure.
|
|
2-22-03
 | |
Checking it out.
|
|
2-22-03
 | |
The end view looking north.
|
|
2-22-03
 | |
The east rail beam anchored to a mini ledger.
|
|
2-22-03
 | |
Looking down the three inch steel U-channel.
|
|
|