11-17-02
 | |
After final leveling of the base, 1/2 inch lag bolts fastened the posts to the footer anchors.
|
|
11-17-02
 | |
Each floor panel was given two coats of stain/seal.
|
|
11-17-02
 | |
The floor panels are 3/4 inch Sturd-I-Floor fastened using 2 1/2 inch screws.
|
|
11-17-02
 | |
The observatory floor is taking shape.
|
|
12-7-02
 | |
The remaining floor panels were installed.
|
|
12-7-02
 | |
The completed floor.
|
|